Наверх

News

Transneft Druzhba Conducts Drill at Voskresenka LODS

Transneft Druzhba has held an emergency response drill (ERD) for extinguishing a simulated fire at the mainline pumping station (MPS) of the Voskresenka LODS of the Kuybyshev Regional Oil Pipeline Directorate.

Transneft Druzhba Completes Scheduled Repairs at Oil Trunk Pipelines

Transneft Druzhba has completed scheduled repairs at the Kuibyshev – Unecha – Mozyr-1 and Unecha – Polotsk-2 oil trunk pipelines, as well as the Ufa – West petroleum products trunk pipeline. The goal was to ensure failure-proof and emergency-free operation of the pipeline transportation facilities.