Наверх

News

Transneft Druzhba conducted repair works at Kuybyshev – Unecha – Mozyr-1 oil trunk pipeline Transneft Druzhba conducted repair works at Kuybyshev – Unecha – Mozyr-1 oil trunk pipeline

Transneft Druzhba finished planned repair works at Kuybyshev – Unecha – Mozyr-1 oil trunk pipeline (OTP). The works on replacement of valves, elimination of defects and connection of the replaced pipeline section were performed within the period of planned stop of the oil trunk pipeline on 16-19 May 2017, in accordance with the production programmes of technical upgrading, revamping and overhaul (TUR&OH) and repair and operational needs (RON).

Employees of Transneft Druzhba, JSC organized an environmental campaign

To the extent of the Year of Ecology declared in Russia in 2017 Transneft Druzhba organized Friendship Tree environmental campaign.  The event organized together with the administration of Fokinskiy district of Bryansk, where the head office of the company is located, lasted a month.

Transneft Druzhba held tabletop drill in Tambov region

A tabletop drill (TTD) was held at the Nikolskoye line operation dispatcher station (LODS) affiliated with the Michurinsk Regional Pipeline Directorate of Transneft Druzhba. Some input data served as the basis for practicing the skills and expertise of actions in threatened emergencies and in case of industrial disaster elimination. The drill was headed by Pavel Revel-Muroz, Transneft Vice President and Chairman of Transneft E&FSC.

Transneft Druzhba changes service boundaries of its branches

Transneft Druzhba completed the integration of its branches operating petroleum product pipelines that were previously part of Transnefteproduсt Samara, whose authorities of a sole executive body were transferred to Transneft Druzhba in 2016.